Industrial Projects

Real builds that pushed our limits. Heavy steel, serious planning, zero compromises on structural integrity.

Portfolio of Heavy-Duty Infrastructure

Over the past decade, we've tackled some seriously challenging industrial builds across Ontario and beyond. Each project here represents months of engineering calculations, site visits in brutal weather, and late-night problem-solving sessions. We don't do cookie-cutter designs—every facility's got unique load requirements, security protocols, and environmental challenges that need custom solutions.

Industrial steel complex
COMPLETED 2024

Hamilton Steel Processing Facility

Area: 125,000 sq ft
Steel: 3,200 tons
Load Cap: 450 tons/bay
Timeline: 18 months

Multi-phase industrial processing center with reinforced crane systems and fortified perimeter security. Dealt with some crazy soil conditions that required deep foundation work nobody expected.

Defense installation
COMPLETED 2023

CFB Trenton Secure Storage

Area: 45,000 sq ft Security: Level 4

Classified storage facility with blast-resistant walls and EMP shielding.

Logistics facility
COMPLETED 2024

Mississauga Distribution Hub

Area: 180,000 sq ft Docks: 52 loading bays

High-capacity logistics center with automated material handling infrastructure.

Energy infrastructure
COMPLETED 2023

Oshawa Energy Substation

Capacity: 500 MW
Voltage: 230 kV
Footprint: 8.5 acres
Duration: 14 months

Critical power infrastructure with fortified security perimeter and redundant systems. Had to coordinate with like 15 different utility companies—total nightmare but got it done right.

Processing facility
COMPLETED 2022

Sarnia Chemical Processing Unit

Area: 65,000 sq ft Safety: Hazmat Level 3 Steel: 1,800 tons

Corrosion-resistant facility with advanced containment systems and emergency protocols.

Mining infrastructure
COMPLETED 2023

Sudbury Ore Processing Center

Area: 95,000 sq ft Capacity: 2,500 tons/day

Heavy-duty mineral processing facility built to handle extreme vibration loads and dust control.

Port facility
COMPLETED 2024

Thunder Bay Port Terminal

Length: 850 ft dock
Capacity: 15,000 tons
Cranes: 3 gantry units

Marine cargo terminal with reinforced dock structure and heavy-lift crane infrastructure.

Storage facility
COMPLETED 2022

Windsor Grain Terminal

Capacity: 45,000 tons
Silos: 12 units
Height: 120 ft

Agricultural storage complex with pneumatic conveyor systems and moisture control infrastructure.

Manufacturing facility
COMPLETED 2023

Kitchener Auto Parts Plant

Area: 210,000 sq ft
Cranes: 8 overhead
Clearance: 45 ft

High-bay manufacturing facility with precision floor tolerances and integrated material handling.

Water treatment facility
COMPLETED 2024

Ottawa Water Treatment Expansion

Capacity: 180M L/day
Area: 75,000 sq ft
Tanks: 6 filtration
Timeline: 22 months

Municipal water infrastructure expansion with corrosion-resistant materials and seismic reinforcement. Working around active operations was tough—couldn't shut down the city's water supply while we built.

Recycling facility
COMPLETED 2023

Brampton Recycling Center

Area: 140,000 sq ft
Lines: 4 sorting
Volume: 450 tons/day
Duration: 16 months

Waste processing facility with heavy-duty conveyor systems and fire suppression infrastructure throughout.

Why These Projects Work

Look, we've been doing this long enough to know what separates projects that last from ones that turn into expensive headaches. Every build you see here started with serious structural analysis—not just meeting code minimums but anticipating real-world stress conditions that'll hit these facilities over decades.

We're not just drawing pretty lines on CAD software. Our team spends time on-site during construction, tweaking details when conditions don't match the blueprints (which happens more than anyone likes to admit). That Hamilton facility? We redesigned the foundation system mid-build when soil tests came back weird. Delayed things by three weeks but saved the client from potential settlement issues down the road.

Each project here represents collaboration with structural engineers who actually understand industrial loads, contractors who've worked on heavy infrastructure before, and clients who get that cutting corners on industrial builds is just dumb. These aren't buildings—they're working machines that need to perform under serious stress for 50+ years.

Technical Capabilities

3,200+
Tons Max Steel
450
Ton Load Capacity
210,000
Sq Ft Max Facility
Level 4
Security Rating
  • ✓ Seismic reinforcement design
  • ✓ Blast-resistant construction
  • ✓ Hazmat containment systems
  • ✓ Heavy crane load engineering
  • ✓ Corrosion-resistant specifications

Got a Heavy-Duty Project in Mind?

Whether you're planning a new industrial facility or expanding existing infrastructure, let's talk about what it'll actually take to build something that lasts.

Start a Conversation